Educational
Modernizing and updating educational environments for students. Innovative and collaborative design solutions are instrumental when meeting tight construction deadlines.
Concordia CL Pavilion
A 13,000 sq ft renovation transformed classroom spaces into a modern, dynamic environment, equipped to enhance the experience for both students and faculty.
2024, Montréal, Québec, Canada
Paul-Comtois School
..Safety was a key concern for this set of stairs in the school. Structural repairs and a redesign were carried out to ensure compliance with code requirements for stair dimensions, guards, and handrails. Cet escalier de l'école présentait un risque majeur pour la sécurité.
2024, Laval, Quebec, Canada
MacDonald High School
In a short four month time span, this public high school had renovations completed to the washrooms, locker rooms, cafeteria and gymnasium. A new electrical system, replacement of the below slab drainage, new exterior canopies, and ceiling replacment completed the work.
2021, Montréal, Québec, Canada
St. Charles Elementary School
Renovation of four student washrooms and the gymnasium. HVAC and electrical systems were upgraded.
….2022, Pierrefonds-Roxboro, Quebec, Canada
James Lyng High School
Multiple improvements throughout the school including new glazing and doors for vestibules, a new roof, new seating and flooring in the auditorium, new ductwork, and asbestos mitigation. All lighting was replaced with new energy efficient fixtures.
….2022, Montreal, Quebec, Canada..2022, Montréal, Québec, Canada….
Concordia University
Replacement of six roofs within the Sir George Williams campus. Several of the buildings were built in the early 1900s requiring heritage restoration compliance. New mechanical equipment and fall protection systems were added to the roofs.
….2023, Montreal, Quebec, Canada..2023, Montréal, Québec, Canada….
De Maisonneuve College
Renovation to the main entrance vestibule and to a kitchenette.
2023, Montreal, Quebec, Canada
The Source Primary School
Outdoor play area was renovated to address drainage and functionality. Project was completed in partnership with HETA Landscape Architecture. Video